Budget and Schedule The budget for this project is based on the parts list shown below. All parts were ordered with the exception of the rope, which was provided as a leftover product from a previous project. The overall budget of the project was $45, which left some room for unexpected costs. Some of that excess money was consumed in ordering a pack of wood which contained more than the required amount, but was much cheaper than ordering a more specific amount of manufactured parts.